| 000 | 00649nam a22001457a 4500 | ||
|---|---|---|---|
| 005 | 20250722105759.0 | ||
| 008 | 250722b |||||||| |||| 00| 0 eng d | ||
| 082 | _aThesis/ECS/AMA 8th Coh. | ||
| 100 | _aAman Mongar | ||
| 245 | _aEstimatingf the magnitude of the probable maximum flood (PMF) on the spillway capacity of the Punatsangchhu-I hydropower plant dam using the multi-model esnemble of NEX-GDDP CMIP6 climate projections under SSP2-4.5 and SSP5-8.5 scenarios / | ||
| 260 |
_aLobesa : Punakha : _bAman Mongar , _c2025. |
||
| 300 |
_avii, 52 p. : _bill. ; _c27 cm. |
||
| 504 | _aIncludes abstracts and acknowledgment | ||
| 942 |
_2ddc _cBOOKS |
||
| 999 |
_c13054 _d13054 |
||