000 00649nam a22001457a 4500
005 20250722105759.0
008 250722b |||||||| |||| 00| 0 eng d
082 _aThesis/ECS/AMA 8th Coh.
100 _aAman Mongar
245 _aEstimatingf the magnitude of the probable maximum flood (PMF) on the spillway capacity of the Punatsangchhu-I hydropower plant dam using the multi-model esnemble of NEX-GDDP CMIP6 climate projections under SSP2-4.5 and SSP5-8.5 scenarios /
260 _aLobesa : Punakha :
_bAman Mongar ,
_c2025.
300 _avii, 52 p. :
_bill. ;
_c27 cm.
504 _aIncludes abstracts and acknowledgment
942 _2ddc
_cBOOKS
999 _c13054
_d13054